Module 2B: Stage 1 Survey and Design

Stage 1 survey is carried along the best route recommended in walkover survey. Is the first level detailed survey in which necessary measurements/details are taken for subsequent design. Field data translated to design which serves as a guiding document for construction of 2.5 m track opening. Cost estimate based on the design is taken as a basis for overall resource/budget planning