Module 2C: Stage 2 Survey and Design Detailing

To be carried out following completion of 2.5 m track opening. Correction of both horizontal and vertical alignment if there are errors  in Stage 1 Survey.  More precise than Stage 1 Survey as it is easy to capture ground features that are visible after phase I track.